Award, together with companies Marte from Brazil and Óptima from Colombia, of the Electromechanical detail engineering, layout adjustment, civil design, design stakeout, resistivity measures, location of structures with PLS CADD management, electromagnetic induction studies and background for the Electrical concession and Environmental Impact Study of the Direct Current Transmission HVDC 600 kV Kimal - Lo Aguirre HVDC Line project.
2021
2021
Award of the international bid for the execution of the technical bases of the Mega Direct Current Transmission Line project, Bi Pole 500 kV HVDC Kimal - Lo Aguirre, 1500 Km, 3000 MW per circuit for the National Power Grid Coordinator (Coordinador Eléctrico Nacional, CEN).
Electrical engineering, instrumentation and control systems for the transfer of Tripper, Correa and Spreader stacking equipment for Minera Spence, BHP/SKIC.
Technical Inspection and Engineering of ST7 project 2x220 kV lines Nueva Maitencillo - Sugar Loaf - Punta Colorada, 2x500 MVA, 196 Km and substations expansion.
2020
2020
Development of the Owner's Eng. for the Renewable Energies portfolio named Huemul, composed of wind farms Cani, Puelche Sur and Llanos del Viento of 109, 156 and 160 MW, respectively, and Photo Voltaic farms Valle Escondido and Pampa Tigre of 122 and 111 MWp.
Detailed engineering of the 220 kV Río Malleco and Nueva Ancud substations, for Abengoa/Transelec.
Technical inspection of works for the Cerros de Huichahue substation project for Eletrans.
2019
2019
Detail Engineering of seven 220/33 kV substations for project Quebrada Blanca II (QB2) for Abengoa - Bechtel/Teck.
Detail Engineering of the Substation and Transmission Line 2x220 kV MAPA project, for Abengoa/Arauco.
Technical Inspection of works for the ST2 2x220 kV Lo Aguirre - Rapel - Alto Melipilla Transmission Line and substations expansion project for Eletrans.
2018
2018
Execution of the first EPC project, since it was acquired by Sigdo Koppers Ingeniería y Construcción (SKIC). It included detail engineering, procurement support, construction, assembly and commissioning management, engineering management and implementation of Smart Plant Foundation, 3D and Electrical for the WP5 Spence Growth Option (SGO) project for SKIC/BHP.
Technical inspection of Río Toltén Substation works for Saesa.
Wind farms San Gabriel and Tolpán connection for Acciona.
2017
2017
Support services in special projects GPRO, Codelco DET.
Inspection and counterpart engineering for the 2x220 kV San Fabián - Ancoa project for Saesa.
Changos – Kimal 2x500 kV Transmission System and design of line details and substations for Coposa/Transelec.
2016
2016
Dessau Chile Ingeniería is acquired by the Sigdo Koppers Group, forming Dessau Ingeniería SpA, a subsidiary of Sigdo Koppers Ingeniería y Construcción.
2015
2015
Start of studies for the interconnection of the two main electrical systems in Chile, Central Interconnected System (SIC) and Norte Grande Interconnected System (SING) for client Alusa/GDF Suez. Subsequently, Dessau also provided design of details, construction support and commissioning services for TEN/Sigdo Koppers Ingeniería y Construcción, leading to the successful interconnection and the creation of what is now known as the National Electric System (Sistema Eléctrico Nacional, SEN).
2014
2014
Together with companies Ingeniería y Diseños INGEDISA and ANTEA Group, we carried out the environmental licensing, detailed design and land surveys of the Sogamoso-Norte Transmission Line, 247 km, and Norte-Tequendama, 131 km, 500 kV, for Grupo de Energía de Bogotá, EBB.
2013
2013
Support services for projects Pacífico Superior Phase I and II; Diablo Regimiento Phase V; Technical Support and Counterpart Recursos Norte, Codelco, El Teniente Division.
2012
2012
Opening to the mining market, multidisciplinary engineering master agreements and support services.
2010
2010
Study and definition of layouts, information for DIA, development of bidding bases for construction, Electromechanical, Civil and Structural design for the Nogales - Polpaico 2x220 kV Transmission Line, transformable to 1x500 kV, 80 Km, and 4 conductors per phase.
2009
2009
Basic and detail design, cadaster and support in easement management, elaboration of BOMT bidding bases and support in the construction process of the High Mountain Transmission System Maitencillo - Caserones, 220 kV and 200 Km, between the Maitencillo Substation, located in the Vallenar area, up to Caserones Substation, 4500 meters above sea level.
2007
2007
Advanced basic design for major project Energía Austral Hydroelectric Complex and the 1050 MW the Aysén - Ciruelos Direct Current Transmission Line of the Río Cuervo, Río Blanco and Lago Cóndor Power Plants, an alternating and direct current collector system with a ±500 kV and 715 km extension, from the Aysén area to the connection to the then Central Interconnected System, in the area of the Ciruelos substation in the vicinity of Valdivia.
2005
2005
Dessau Ingentra prepared the basic engineering and bidding documents of the company that owns the EPR network, supervised their works, and inspected the supply and manufacturing of the Electrical Interconnection System for Central America (Sistema de Interconexión Eléctrica Países América Central, SIEPAC), consisting of 1800 km of 230 kV lines and 15 substations in Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica and Panama.
2003
2003
Dessau Inc., a Canadian capital company with more than 40 years of experience in large-scale construction projects operating in more than 50 countries, acquires Ingentra in order to consolidate its position in the Energy market in Chile and the Region.
2002
2002
Conceptual, basic and detailed design; technical inspection of works; supervision of purchases and commissioning of the high mountain transmission system that feeds the Collahuasi mining project.
2001
2001
Electromechanical, Hydraulic Design, Civil and Mechanical Works of mini hydroelectric power plant Lago Avesado for the client EdelAysen.
2000
2000
Award of basic and detail engineering; preparation of bidding documents; technical inspection of works and coordination of the commissioning of more than 20 facilities in the surroundings of the cities of Arica, Iquique and Antofagasta for Transemel.
1999
1999
A group of professionals and technicians who had been working in the energy sector for more than 30 years founded Ingentra. The founders’ specialized knowledge in developing power generation and transmission projects -from preliminary studies to commissioning- and experience in managing these projects, as well as in the quality control of construction works, through the provision of Technical Inspection of Works services, allowed them to quickly position themselves as a relevant market player.